SISTEM INFORMASI MANAJEMEN
SEBAGAI PENDUKUNG KEPUTUSAN
SEBAGAI PENDUKUNG KEPUTUSAN
Oleh
Jeane K. Nirahua
|
NO.
|
Perangkat yang dibutuhkan
|
Satuan
|
Harga Satuan
|
Total
|
|
1.
|
Windows Server 2008 Standart 5
Calf
|
1
|
6.500.00
|
6.500.000
|
|
2.
|
RJ-45 leading sulication utp SE
|
5 dus
|
130.000
|
650.000
|
|
3.
|
Kabel utp vascolink CCA
|
5
|
400.000
|
2.000.000
|
|
4.
|
D-Link des 50 managed switch 48
port
|
1
|
5.500.000
|
5.500.000
|
|
5.
|
D-Link des 1008A port 10/100
mbps
|
1
|
100.000
|
100.000
|
|
TOTAL
|
14.750.000
|
|||
|
No
|
|
Uraian
|
Satuan
|
Jumlah
Satuan
|
Harga
Satuan (Rupiah)
|
Jumlah
Harga (rupiah)
|
Sub
Total (Rupiah)
|
|
1.
|
Biaya
Pengadaan
|
|
|
|
|
|
|
|
|
a.
|
Biaya Pembelian Perangkat (Hardware dan Software)
|
|
|
|
14.750.000
|
|
|
|
b.
|
Biaya Instalasi Perangkat
|
Hari
|
2
|
500.000
|
1.000.000
|
|
|
|
Total Biaya
|
15.750.000
|
|||||
|
2.
|
Biaya
Proyek
|
|
|
|
|
|
|
|
|
a.
|
Network Enginering (@5Orang)
|
Hari
|
30
|
500.000
|
15.000.000
|
|
|
|
Total Biaya
|
15.000.000
|
|||||
|
|
b.
|
Tahap Desain dan Implementasi
|
|
|
|
|
|
|
|
|
Biaya Rapat
|
Hari
|
2
|
100.000
|
200.000
|
|
|
|
|
Biaya Dokumentasi
|
Eks
|
5
|
100.000
|
500.000
|
|
|
|
|
Total Biaya Desain dan Implementasi
|
700.000
|
||||
|
|
c.
|
Tahap Testing
|
|
|
|
|
|
|
|
|
Biaya testing
|
Hari
|
3
|
200.000
|
600.000
|
|
|
|
|
Total Biaya Testing
|
600.000
|
||||
|
|
d.
|
Biaya Training
|
|
|
|
|
|
|
|
|
Penyediaan Dokumentasi
|
Eks
|
10
|
30.000
|
300.000
|
|
|
|
|
Konsumsi
|
Hari
|
3
|
50.000
|
150.000
|
|
|
|
Total Biaya Training
|
450.000
|
|||||
|
3.
|
Biaya
Maintenece
|
|
|
|
|
|
|
|
|
|
Biaya Personil (Operator)
|
Bulan
|
1
|
750.000
|
750.000
|
|
|
|
|
Biaya Perawatan Harware (reparasi, servis)
|
Bulan
|
1
|
500.000
|
500.000
|
|
|
|
|
Total Biaya Maintenace
|
1.250.000
|
||||
|
|
Jumlah
Total
|
33.750.000
|
|||||
|
No.
|
Nama Pengerjaan
|
Mulai
|
Selesai
|
Waktu
|
|
1.
|
Analisis Rancangan
|
01/04/2013
|
03/04/2023
|
2 Hari
|
|
2.
|
Belanja Perangkat
|
04/04/2013
|
07/04/2013
|
3 Hari
|
|
3.
|
Instalasi Perangkat
|
10/04/2013
|
15/04/2013
|
5 Hari
|
|
4.
|
Instalasi Jaringan
|
18/04/2013
|
18/05/2013
|
30 Hari
|
|
5.
|
Testing Jaringan
|
19/05/2013
|
22/05/2013
|
3 Hari
|
|
6.
|
Training Operator
|
23/05/2013
|
25/05/2013
|
3 Hari
|
|
ITEM
PENILAIAN
|
SOLUSI
|
|
Ketersediaan Teknologi di pasaran
|
Mudah
|
|
Kemudahan pengoperasian
|
Mudah
|
|
ITEM
PENILAIAN
|
SOLUSI
|
|
Kemampuan Personil
|
Baik
|
|
Kemampuan sistem melakukan prosedur
|
Baik
|
|
Kemampuan penyediaan informasi
|
Baik
|
|
Efisiensi dari sistem
|
Baik
|
|
Keamanan Data
|
Baik
|
|
ITEM PENILAIAN
|
Kendala
|
Solusi
|
|
Waktu Pengembangan Sistem
|
1 Tahun
|
8 Bulan
|
|
Kemudahan pengoperasian
|
-
|
100%
|